Project Management Methodology

PMBOK® Guide Aligned · PMI Framework · 5-Phase Lifecycle

Download .pdf
Document No.
ACG-IIS-PMM-001
Version
Rev. 1.0
Issue Date
28 March 2026
Framework
PMBOK® Guide
Phases
5-Phase Lifecycle
Structured delivery: The ACG IIS Project Management Methodology defines the processes, tools, roles, and governance structures applied to every project — from inception through handover — ensuring delivery on scope, on time, within budget, and to the quality and compliance standards required by clients, donors, and regulatory authorities.

Download for tender submission

1. Introduction and Framework

ACG IIS delivers infrastructure and development projects using a structured project management methodology aligned with internationally recognised frameworks, including the PMBOK® Guide (PMI), with adaptation for the specific compliance, procurement, and field execution contexts of East Africa and the Middle East.

The ACG IIS Project Management Methodology (PMM) is designed to ensure that projects are delivered on scope, on time, within budget, and to the quality and compliance standards required by clients, donors, and regulatory authorities.

2. Project Lifecycle Phases
PhaseNameKey Activities
Phase 1InitiationProject Charter, stakeholder identification, feasibility review, client brief confirmation
Phase 2PlanningWBS development, schedule baseline, resource plan, procurement plan, risk register, QMP, HSE plan
Phase 3ExecutionEngineering, procurement, construction/installation, compliance management, stakeholder reporting
Phase 4Monitoring & ControlProgress tracking, schedule variance analysis, cost control, change management, QA/QC audits
Phase 5Close-outCommissioning, testing, handover documentation, client sign-off, lessons learned, final reporting
3. Project Governance

3.1 Project Structure

Every ACG IIS project is assigned a named Project Manager with full accountability for delivery. The Project Manager reports directly to the ACG IIS Operations Director and has a defined authority matrix governing approvals for scope changes, procurement decisions, and stakeholder communications.

3.2 Steering and Reporting

  • Weekly progress reports issued to client covering scope, schedule, cost, risk, and issues
  • Monthly project review meetings held with client representatives and key stakeholders
  • Milestone reports issued on achievement of each project phase gate
  • Exception reports issued within 24 hours of any event causing or threatening a variance of >5% on cost or schedule

3.3 Change Management

No change to project scope, schedule, or budget is implemented without a documented Change Request (CR). The CR process includes impact assessment, client approval, and formal baseline update before implementation. Unauthorised scope changes are treated as nonconformances under the QMS.

4. Planning Tools and Schedule Management
  • Work Breakdown Structure (WBS) — hierarchical decomposition of project deliverables to work package level
  • Network scheduling — Critical Path Method (CPM) for schedule development and analysis
  • Gantt chart format reports for client communication
  • Schedule baseline — set at project planning phase and subject to formal change control
  • Earned Value Management (EVM) — applied on projects exceeding USD 500,000 or as specified by the client
  • 3-week look-ahead schedules maintained by site supervisors on all active construction sites
5. Risk Management
StepActivityOutput
1IdentificationRisk Register — all identified risks categorised by type (technical, commercial, HSE, political, supply chain)
2AssessmentRisk rating matrix (likelihood × impact) — scoring 1–5 × 1–5
3Response PlanningRisk response: Avoid / Reduce / Transfer / Accept — with named owner and target date
4MonitoringRisk register reviewed at each project meeting; escalation thresholds defined per risk category
6. Procurement Management

Procurement on ACG IIS projects is managed through the integrated NOVA Platform supply chain, backed by the RedGround catalogue of 300,000+ products and a qualified supplier network of 135+ international suppliers.

  • A project Procurement Plan is prepared at the planning phase identifying all major materials, equipment, and services
  • Procurement is subject to the ACG IIS Procurement Procedure: supplier qualification, competitive sourcing, technical and commercial evaluation, and formal award
  • All procurement documentation — RFQs, proposals, purchase orders, delivery records — maintained in the project document management system
  • Imported goods procured under ICC Incoterms 2020 and subject to import compliance procedures
  • Where donor procurement rules apply (World Bank, USAID), ACG IIS operates within those frameworks as the primary obligation
7. Stakeholder and Communications Management

A Stakeholder Register and Communications Plan is prepared at the outset of each project, identifying all stakeholders, their interests and influence, and the communication channels and frequency applicable to each.

ACG IIS recognises that infrastructure and development projects in East Africa and the Middle East operate in contexts with multiple stakeholder groups including community representatives, local authorities, national government agencies, and donor oversight bodies. Community engagement is managed with cultural sensitivity and in accordance with IFC Performance Standard 5 and PS 7 where applicable.

8. Handover and Close-out

Project close-out is a managed phase with a defined Handover Checklist including:

  1. Completion of all punch-list items and acceptance by the client
  2. Commissioning test records, as-built drawings, and O&M manuals delivered
  3. HSE close-out — incident register, waste disposal records, site reinstatement confirmation
  4. Quality close-out — final nonconformance register, audit findings, corrective action status
  5. Financial close-out — final cost report, variation account, project margin report
  6. Lessons learned workshop conducted with project team and key subcontractors
  7. Client satisfaction survey completed and filed in the project record
Approved by
Managing Director
Agacan Tarım Gıda Turizm Ltd. Şti.
Document Details
Document No: ACG-IIS-PMM-001
Version: Rev. 1.0
Issue Date: 28 March 2026
Aligned: PMBOK® Guide / PMI
Prequalification submissions All documents are available for download and may be cited in tender prequalification submissions. Document references follow the format ACG-IIS-[TYPE]-[SEQ].
RFQ Basket

Your RFQ basket is empty

Browse the catalogue and add items to build your requirement list Browse catalogue
Search